Wood deck and stairs rebuilt by Elite Construction Contracting behind a home in Bend, Oregon

Decks / Bend, Oregon

Deck Builder in Bend, Oregon for New Decks, Rebuilds and Refinishing

Some decks need a new coat of stain, some need new boards on the old frame, and some need to come down. We tell you which one yours is, then build it to stand up to Bend's snow and summer sun. Free written estimates.

  • Oregon CCB #209888
  • Licensed, bonded and insured since 2016
  • 5.0 Google rating from 10 reviews
  • BBB A+ accredited since 2017

Free Estimate / 01

Get a Deck Estimate in Bend

Tell us about the deck you have or the one you want. A few details up front help us bring the right measurements and samples to the site visit:

  • Rough size, or the space you want covered
  • How high the deck sits off the ground
  • Which way it faces, and how much afternoon sun it gets
  • Wood or composite, if you already have a preference
  • For an existing deck, a photo of the framing underneath
  • Stairs, railing style, or a pergola you are considering

We reply within 48 hours on business days to set up the visit. Office hours are Monday to Friday, 7:00 am to 5:00 pm.

Prefer to talk? Call (541) 497-0123

Your Options / 02

Refinish, Resurface or Rebuild? How to Tell What Your Deck Needs

Most homeowners call us asking for a new deck. A good share of them do not need one. The frame underneath decides which of these three jobs makes sense.

01

Refinish

Frame and boards are sound

The deck is gray, rough or splintering, but the boards are solid and the railing is tight. We clean, sand, replace the odd cracked board and apply a penetrating stain. This is the least expensive way to make an old deck look new again.

02

Resurface

Frame is sound, boards are not

Boards are cupped, rotting at the ends or soft underfoot, but the joists, beams and posts are still in good shape. We strip the surface down to the frame, fix what needs fixing and lay new wood or composite boards and railing. You get a new deck surface without paying for a new structure.

03

Rebuild

The structure has failed

Rot in the joists or ledger, posts sitting on blocks that have shifted, or a railing that moves when you lean on it. Then the safe answer is a new deck from the footings up, usually with a better layout and better stairs than the one it replaces.

A five minute check you can do yourself

Before you call anyone, take a flashlight and a screwdriver under the deck. What you find tells you which of the three jobs above you are probably looking at.

  • Poke the wood. Press a screwdriver into the joists next to the house and at the tops of the posts. If it sinks in easily, that wood is rotting.
  • Look at the ledger. That is the board that holds the deck to the house. It should be bolted on, with metal flashing above it. If it is held on with nails, or you see dark staining on the siding behind it, that needs attention.
  • Check the hardware. Joist hangers and bolts that are flaking with rust are losing strength.
  • Look at the posts. Posts sitting on precast blocks that have tipped or sunk will keep moving.
  • Push the railing. A guardrail post should barely move when you lean on it.

If a railing moves or the ledger is pulling away from the house, keep people off the deck until it has been looked at. Most serious deck failures start at the railing or at the connection to the house, not in the middle of the deck.

Materials / 03

Wood or Composite Decking in Central Oregon

At 3,600 feet the sun is strong, the air is dry and winters swing above and below freezing all season. That is hard on any deck surface. Here is the honest version of the tradeoff.

Wood decking

Cedar or pressure treated

  • Lower cost up front, and easy to repair one board at a time
  • Cedar looks and smells like a mountain house
  • Our high desert UV turns unfinished wood gray within a season or two
  • Needs restaining every few years to keep from checking and splintering
  • Can be sanded and refinished many times over its life

Composite decking

Capped composite boards

  • Costs more up front, but there is no staining, sealing or sanding
  • No splinters, and it holds its color far better in strong sun
  • Dark colors get very hot to bare feet on a July afternoon, so lighter tones are a better pick for south and west facing decks
  • Usually needs joists closer together than a wood deck
  • Cannot be refinished. Deep scratches stay, so use a plastic shovel and check the maker's guidance on ice melt.

Whichever surface you choose, the frame underneath is pressure treated lumber, and it is the frame that decides how long the deck lasts. We bring board samples to the estimate so you can see colors in your own light.

Construction / 04

How We Build a Deck for Snow, Sun and Freeze-Thaw

The parts of a deck that matter most are the ones you never see after it is finished. This is where we spend the time.

  • Footings below the frost line. Ground that freezes and thaws all winter will lift a shallow footing a little more each year. We dig deep enough that the deck stays level.
  • A ledger flashed behind the siding. Many deck builders bolt the ledger straight through the siding and run a bead of caulk. Because siding is our main trade, we remove the siding where the ledger goes, flash it properly and put the siding back. That is how you avoid the rotted rim joist we find behind a lot of older Bend decks.
  • Tape on top of the joists. A strip of joist tape keeps snowmelt from soaking into the screw holes. It is cheap, and it adds years to the frame.
  • Room for snow. We look at where snow slides off your roof and plan the stairs and walkways out of that path.
  • Gaps that drain. Board spacing that lets water, pine needles and dirt fall through instead of sitting on the frame.
  • Thinking about wildfire. On lots near open land, we can use ignition resistant materials and close off the space under the deck with metal mesh so embers and needles cannot collect there.

Permits / 05

Do You Need a Permit for a Deck in Bend?

Under Oregon's residential code, a deck generally needs a building permit if any one of these is true:

  • It is attached to the house
  • Any part of it is more than 30 inches above the ground
  • It is larger than 200 square feet
  • It serves a door you need to get out of the house

Inside city limits the permit comes from the City of Bend. On rural property it comes from Deschutes County. Simply refinishing a deck, or replacing boards on the same frame, usually does not need one. If your project does, we handle the drawings, submit the application and schedule the inspections. Rules get updated, so we confirm the requirements for your project before we quote.

Many Bend neighborhoods also have an HOA that reviews deck size, railing style and color. Get that approval in writing before materials are ordered. We will give you the specs and samples you need to submit.

Attached pergola with timber beams and stone columns over an outdoor living space in Bend, Oregon built by Elite Construction Contracting
Shade over the outdoor living space, Bend.

Shade / 06

Adding Shade to a West Facing Deck

A deck that faces west in Bend can be too hot to use from mid afternoon until the sun goes behind the Cascades. A pergola over part of the deck fixes that, and it is easiest and cheapest to plan while the deck is being built, because the posts can carry down to their own footings. A solid patio cover is also an option, but once a structure has a roof it has to carry Bend's snow load, so it is engineered differently from an open pergola. See our pergola and shade structure work for examples.

Process / 07

From First Visit to First Barbecue

  • Site visit. Tim measures, checks the existing frame or the ground, and talks through how you will use the space.
  • Layout and written estimate. You get a drawing, a material list with board samples, and a price that separates demolition, framing, decking, railing and stairs.
  • Permit and HOA approval. When the project needs them, we prepare and submit the paperwork, and we do not order material until both are approved.
  • Build. Footings and framing come first, followed by the framing inspection, then decking, stairs and railing. Our own crew does the work and cleans up every day.
  • Walk through and care notes. We walk the finished deck with you and leave written care instructions for the material you chose.

Most of our business is siding, and we also handle roof replacement and repair in Bend, which makes us a good fit when the deck project turns up rot in the wall behind it.

Timber, stone and cedar exterior on a Central Oregon custom home by Elite Construction Contracting
Timber and cedar detailing we match when a deck meets the house.

FAQ / 08

Deck Questions From Bend Homeowners

How much does a new deck cost in Bend?

The biggest drivers are size, height off the ground, decking material, railing style, the number of stairs, and whether an old deck has to be torn out first. A low, ground level deck with wood boards and a simple rail costs far less per square foot than a second story deck with composite boards and cable or metal railing. Putting new boards on a frame that is still sound is usually the least expensive option of all. We do not give square foot prices over the phone, because the frame and the site change the number too much. The estimate is free and comes in writing after we see the deck.

When should I book a deck project in Bend?

If you want to use the deck this summer, call in late winter or early spring. That leaves time to design it, get a permit if one is needed, and order materials before the busy season. We build through spring and fall as well. The one real limit is concrete: new footings need to be poured when the ground is not frozen, so a full rebuild in the middle of winter usually waits for a thaw.

How often does a wood deck need to be restained here?

With a semi-transparent oil stain, plan on every two to three years for the walking surface and a little longer for railings, which do not take foot traffic. Decks facing south or west fade fastest. A simple test: sprinkle water on the boards. If it beads, the finish is still working. If it soaks in and darkens the wood right away, it is time.

Can you put new boards on my existing frame?

Often, yes. We pull a few boards, check the joists, beams, ledger and posts, and tell you whether the frame has another twenty years in it. If you are switching from wood to composite, the joists may need to be closer together than the original builder spaced them, and we can add joists between the existing ones rather than rebuilding the whole frame.

Do you haul away the old deck?

Yes. Demolition and disposal of the old deck are part of our estimate, listed as their own line so you can see what they cost.

Do you build decks in Redmond, Sisters and Sunriver?

Yes. Deck work in all three towns is part of our regular schedule. If you are in Redmond, our Redmond siding, roofing and deck page covers what we see on homes there. In Sunriver and in neighborhoods with an HOA, plan for design review on color and material before we order anything.

Next Step

Want to know if your deck can be saved?

Phone Tim at the office, or use the deck request form above and attach a photo of the framing if you can. After one site visit you will know whether it is a refinish, new boards or a rebuild, and what each would cost.